Huang, M. (2026). Digital Twin Technology Drives Real-Time Scheduling Optimization for Port Container Operations: A Verification Study Centred on the Goals of Efficiency Improvement and Cost Control. Financial Economics Research, 3(2), 176-182. https://doi.org/10.70267/fer.250302.176182